Site Construction Plan & Progress

BALL & SOCKET ARTS DEVELOPMENT PLAN

Phase 1 - 9,000 sf Completed July 2024

Phase 1 presents a microcosm of the larger Ball & Socket Arts project. It has become a foothold, allowing us to present programming and cultivate donors and partners while we raise funds for Phase 2 and for the more challenging large-scale buildings on-site.

Elements of Phase 1 are:

  • Full renovation of Building 2 (The Willow Street Building), to house two mission-aligned tenants: Sweet Claude’s Ice Cream, a beloved local ice cream shop founded in 1988, making their own artisanal ice cream and serving it from our historic store front, and Artsplace, a municipally run art school offering classes, workshops and camps in various artistic fields to students of all ages. Artsplace was founded in 1987 and has inspired generations of creators.

  • Full renovation of Building 3 which includes the first floor Workshop Gallery, and offices for Ball & Socket Arts on the second floor.

  • Parking and landscaping along the West Main Street frontage

  • The creation of a large rear parking lot between Building 1 and Building 5, including the spur with direct access to the Farmington Canal Heritage Trail

  • Facade restoration of the brick buildings

  • New sidewalks and streetscapes along Willow Street

Phase 2 - 54,000 sf

Phase 2 will be the largest phase, ultimately returning the site to public use. Elements of Phase 2 include:

  • Remediation systems operational in Building 1

  • Major structural repairs and fire safety systems installed in Building 1

  • Beginning of window restoration throughout Building 1

  • Renovation of 45,000 square feet comprising Building 1 (the main factory building). The final complex will house:

    • the grand art gallery,

    • a flexible performance space for music, lectures, readings, film screenings and more

    • the welcome center, 

    • an interactive historical space,

    • retail shops (mission-aligned)

    •  a food court, featuring local businesses

    • a bike shop

  • Complete renovation of  Building 5 (The Power House) to house commercial tenant

  • Complete parking and landscaping site-wide

Milestones